- Home
- ...
- Categories
- Stand
- Stand Technique
- Supplies and Connections
- Electricity
- Connectors exhibits (hall)
- 3-phase current connection, 400 V 3-PH up to 19 kW (for exhibits / machines)
3-phase current connection, 400 V 3-PH up to 19 kW (for exhibits / machines)
extended deadline 16.06.2023 *
(* the original deadline has expired since 18.04.2023 )
To order products, please log in. Go to login
Please enter the positioning of your order into the stand sketch.
Please notice, that in case of delay, Messe Düsseldorf cannot guarantee handling in due form, and time and/or the services may not be executable anymore!
Besides, all incoming orders that reach Messe Düsseldorf less than 21 calendar days before the assembly period are subject to a late delivery charge of 35% on all prices and charges. This also applies to any documents that still require clarification or which are still incomplete by that date.
For safety reasons, the electric power will be switched off one hour after closure of the event on the last day.
A power factor of COS phi = 0.8 applies to all power connections and a frequency of 50 Hz.
Prices include material (rental), construction and dismantling.
You will find further information at section 3.1.1, 3.1.2 and 5.3 of the Technical Guidelines.
Details at a Glance
- 3-phase current connection 400 V
- 3-PH up to 19 kW
- for exhibits / machines
Each ordered item must be entered in the stand layout plan. Otherwise it may be positioned at Messe Düsseldorf’s discretion.
We charge a basic fee of €28.20 for connecting the stand to the hall power supply.
Power consumption is charged per kW/h, as shown on the relevant meter. The current power consumption fee per kW/h is €0.80 plus VAT, as shown on the installed meter.
Cable lengths for all connections are approx. 5 metres from floor outlets. Excess lengths over 5 metres are available on request, against a surcharge.
For safety reasons, the power supply is turned off on the last day of the trade fair, one hour after the end of the event. Should you require electric power beyond that time, please make sure you let us know in good time.
According to VDE 0100 Part 711, an ELCB switch (RCD) with less than 30 mA cut-off current is mandatory for power terminal circuits such as socket outlets and light feed-in with up to 32 ampères.
Details of Service Partner Messe Düsseldorf GmbH:
Messe Düsseldorf is one of the 5 most successful trade fair organisers worldwide. Some 30.000 exhibitors present their products to 1.5 million trade visitors at events in Düsseldorf each year. About 50 trade fairs are being held in Düsseldorf, including 23 global leaders in five areas of expertise: machinery, plants and equipment, retail, trade and services, medicine and healthcare, fashion and lifestyle, and also leisure. Messe Düsseldorf GmbH is the trade fair company wi... read more